Pwd Dsr 2015-16 Maharashtra Work -

The Public Works Department (PWD) of Maharashtra issues the District Schedule of Rates (DSR) annually to provide a standardized list of unit rates for various construction-related activities. These rates are crucial for government engineers, contractors, and consultants to prepare accurate estimates for public infrastructure projects. Key Components of PWD DSR 2015-16

The 2015-16 DSR for Maharashtra was published for various districts, including Thane, Raigad, and Pune. The schedule generally covers: Maharashtra PWD DSR Rates 2015-16 | PDF | Masonry - Scribd

The PWD (Public Works Department) Schedule of Rates (DSR) for Maharashtra for the year 2015-16 is a crucial document used for estimating costs and preparing bills for civil engineering works in the state.

Here is a comprehensive review and analysis of the DSR 2015-16, highlighting its structure, key changes from previous years, and its current relevance.

Key Rate Analysis of DSR 2015-16 (Illustrative Examples)

To understand the relevance of the PWD DSR 2015-16, let us examine some basic rates for a district like Pune or Nagpur (rates are approximate and for illustration only, as actual DSR rates are more granular): Pwd Dsr 2015-16 Maharashtra

| Item Description | Unit | Rate (Pune District) – 2015-16 | Remarks | |---|---|---|---| | Excavation in ordinary soil (depth up to 1.5m) | cum | ₹ 85 – ₹ 110 | Manual or mechanical as per clause | | Providing PCC 1:4:8 (40mm aggregate) | cum | ₹ 3,200 – ₹ 3,500 | Including cost of materials and curing | | RCC M20 grade (1:1.5:3) with steel reinforcement | cum | ₹ 5,800 – ₹ 6,200 | Excluding cost of steel | | Reinforcement steel (Fe 500) | MT | ₹ 48,000 – ₹ 52,000 | Including cutting, bending, binding | | Brick masonry in CM 1:6 (common burnt clay bricks) | cum | ₹ 4,500 – ₹ 5,000 | Including scaffolding | | Plaster 12mm thick 1:4 (cement:sand) | sqm | ₹ 85 – ₹ 105 | Smooth finish | | Granular Sub-Base (GSB) | cum | ₹ 650 – ₹ 750 | Including watering and rolling | | Bituminous Concrete (BC) with 60/70 grade bitumen | MT | ₹ 7,500 – ₹ 8,200 | Includes hot mixing and laying | | Whitewashing / Color washing (two coats) | sqm | ₹ 18 – ₹ 25 | Including surface preparation |

Important Note: These rates exclude GST, which was not in effect at the time. They also exclude contractor’s profit and overhead (typically 10-15% added separately) and price escalation.


Major Chapters in the DSR 2015-16

The DSR covers over 2,500+ items across the following broad sections:

  • Chapter 1: Earthwork – Excavation, filling, compaction, and disposal of excavated material.
  • Chapter 2: Concrete Works – PCC, RCC, formwork, and precast elements.
  • Chapter 3: Masonry – Stone, brick, and block masonry.
  • Chapter 4: Finishing – Plaster, pointing, flooring, and tiling.
  • Chapter 5: Roofing & Waterproofing – Terrazo, tile roofing, and damp proof course.
  • Chapter 6: Woodwork & Carpentry – Doors, windows, and frames.
  • Chapter 7: Steel Work – Reinforcement, structural steel fabrication, and erection.
  • Chapter 8: Sanitary & Water Supply – Plumbing, sewerage, and water tanks.
  • Chapter 9: Road Works – Granular sub-base, WMM, bituminous courses (BM, DBM, BC).
  • Chapter 10: Bridge Works – Piling, launching girders, bearings, etc.

8. When to Use DSR 2015-16 in 2026?

| Use Case | Appropriate? | |----------|---------------| | Arbitration / dispute for 2015-18 contracts | ✅ Yes (with escalation) | | Old repair work estimates (pre-2016 designs) | ✅ With index | | Current govt. tender estimate | ❌ No – use latest DSR | | Private cost comparison (historical) | ✅ Yes | | Student / exam reference (estimating practice) | ✅ Yes | The Public Works Department (PWD) of Maharashtra issues


2. Basis of Rate Fixation (2015–16)

The rates for 2015–16 were derived based on:

  • Market rate surveys conducted in district headquarters and major talukas during March–April 2015.
  • Minimum wages for construction workers under the Maharashtra Minimum Wages Rules (revised for 2015).
  • Hire charges for machinery (as per CPWD and PWD Maharashtra guidelines).
  • Lead and lift charges for materials (up to 5 km lead free; beyond that, additional carriage costs applied).

Assumptions for DSR 2015–16:

  • Basic lead: 5 km
  • Basic lift: 1.5 m (for earthwork)
  • Water charges: 1% of total work value (except for concrete where included in mix)
  • Contractor’s overhead & profit (COP): 15% (included in all item rates)

Key Features and Calculations

One of the most important aspects of the DSR is how it handles "Lead and Lift."

  • Lead Charges: The cost of transporting materials from the source to the worksite. The DSR provides base rates, and contractors must calculate the additional cost based on the distance (lead) using standard transportation formulas provided in the schedule.
  • Lift Charges: The cost involved in raising materials to a certain height during construction (e.g., high-rise buildings).

The 2015-16 DSR also included specific premiums (additional costs) for: Major Chapters in the DSR 2015-16 The DSR

  • Taxes: Adjustments for VAT (Value Added Tax) and other statutory levies applicable at the time (pre-GST era).
  • Specialized Items: Rates for items not listed in the DSR are often derived by analyzing similar items or through market quotations, but the DSR provides the formula for this derivation.

3. Key Updates and Changes in 2015-16

Compared to its predecessor (DSR 2013-14), the 2015-16 edition introduced several significant changes:

  • Revision of Basic Rates:

    • Steel and Cement: The basic rates for these core materials were adjusted to reflect market trends of that period. The volatility in steel prices was addressed by keeping the basic rate slightly conservative, relying on price escalation clauses during actual execution.
    • Labour Rates: There was a revision in the minimum wages of labour as per the Government of Maharashtra's notifications. The "Labour Constant" (mandays required for specific tasks) was analyzed to align with modern machinery usage (e.g., use of excavators instead of manual earth cutting).
  • Introduction of New Technologies:

    • Ready Mix Concrete (RMC): Separate items for RMC were more distinctly defined compared to previous editions, acknowledging the shift from site-mixed concrete.
    • Polymer and Chemical Additives: New items for construction chemicals, waterproofing compounds, and polymers were added, reflecting modern construction practices.
    • Road Technology: Items related to Wet Mix Macadam (WMM) and Dense Bituminous Macadam (DBM) were refined. The use of Crusher Dust in GSB (Granular Sub-Base) was given specific weightage.
  • SRA (Slum Rehabilitation Authority) Alignment: Special provisions and schedule items were synchronized to some extent with SRA requirements, which were major drivers of construction in Mumbai and surrounding regions during that fiscal year.