Standard Construction Specifications Part 2 Abu Dhabi -

Standard Construction Specifications (SCS) Part 2 typically refers to the detailed technical requirements for Road Utilities

. While Part 1 focuses on general road works like earthworks and pavement, Part 2 provides the granular specifications for infrastructure that supports the transport network. TAMM - Abu Dhabi Government Services Primary Content of SCS Part 2 (Road Utilities) According to the Department of Municipalities and Transport (DMT) Abu Dhabi Quality and Conformity Council (QCC) , Part 2 generally covers the following technical chapters: TAMM - Abu Dhabi Government Services Lighting and Electrical Distribution Works

: Specifications for street lighting poles, cabling, and distribution boards. Stormwater Drainage

: Materials and installation standards for pipes, manholes, and gullies. Utilities (General)

: Coordination and protection of existing services within the road right-of-way. Landscaping and Irrigation standard construction specifications part 2 abu dhabi

: Details for soft landscaping, pipework, and automatic irrigation systems used in road medians and verges. Key Performance Standards in Part 2 Technical references like

specify rigorous performance criteria for infrastructure foundation and utilities: TAMM - Abu Dhabi Government Services Settlement Limits

: Total settlement for footings must not exceed 25mm, while rafts are limited to 50mm at 100% design load. Liquefaction Safety

: A minimum safety factor against liquefaction of 1.25 is required for ground stability. Soil Bearing Capacity (CBR) Compliance & Regulatory Context

: In-situ California Bearing Ratio (CBR) of improved ground should typically be no less than 10%. TAMM - Abu Dhabi Government Services Relation to Building Codes

While SCS Part 2 governs infrastructure and roads, vertical building construction is regulated by the Abu Dhabi International Building Code (ADIBC) . In the ADIBC framework, "Part 2" often refers to Administration and Enforcement

, detailing the duties of code officials and the process for obtaining inspections and approvals. دائرة البلديات والنقل

For official project documentation, contractors and consultants typically access these standards via the TAMM platform DMT E-Library Stormwater sections within the utility specifications? ABu DhABI IntErnAtIonAl BUILDING CODE • adibc Mandatory for government projects – All Abu Dhabi


Compliance & Regulatory Context

  • Mandatory for government projects – All Abu Dhabi municipality tenders reference SCS Part 2.
  • Often adopted by private developers (e.g., Aldar, Modon) as a baseline.
  • Works alongside Abu Dhabi International Building Code (ADIBC) and Estidama Pearl Rating System.
  • Non-compliance results in stop-work orders, fines, or rejection of as-built submissions.

Common Pitfalls & Contractor Notes

  • Mixing of SCS Part 2 with Abu Dhabi Municipality General Conditions – always confirm the issuing authority (e.g., Abu Dhabi City Municipality vs. Al Ain Municipality).
  • Dewatering discharge permits are required if water is released into stormwater or sewage networks.
  • Topsoil stripping depth (usually 150–300 mm) is strictly enforced to prevent later settlement issues.

Integration with BIM and Digital Delivery (2024 Update)

The latest iteration of Standard Construction Specifications Part 2 Abu Dhabi now includes mandatory references to Building Information Modeling (BIM) for infrastructure projects > 50 million AED.

New subsection 1.08 (Digital Handover) requires:

  • All as-built data to be delivered in IFC 4.0 format.
  • Compaction test results geo-located within a 3D model (GIS integration).
  • CCTV drainage surveys embedded as video references at exact chainages.

Contractors without BIM-level 2 capability (as per PAS 1192, adapted) cannot bid on major municipal projects.